Foundation Fieldbus Parameter Search (βeta)

"Taking the frustration out of foundation"

Parameters Units About Contact
 
Parameter:
+17 like(s) hidden.
INIT_ACT_TIME_DOWN INIT_ACT_TIME_UP INIT_DEAD_ZONE_ADAPT_TIME INIT_END_VALUE_P100 INIT_INTERPULSE_PERIODE_LEN INIT_PREDICTION_DOWN INIT_PREDICTION_UP INIT_PULS_LENGTH_DOWN INIT_PULS_LENGTH_UP INIT_RATED_TRAVEL INIT_REF_VALUE_HORIZ_LEVER INIT_ROTARY_ACT_END_FLAG INIT_SAFTY_POSITION_FLAG INIT_SERVO_GAIN_DOWN INIT_SERVO_GAIN_UP INIT_SLIP_CLUTCH_ADJ_FLAG INIT_ZERO_POINT_P0

+1 reference(s) hidden.
Siemens AGSIPART PS2 FF0101Analog OutputTransducer
Description:Initialization parameters
Child(s):1 – INIT_SLIP_CLUTCH_ADJ_FLAG
10 – INIT_ZERO_POINT_P0
11 – INIT_END_VALUE_P100
12 – INIT_PREDICTION_UP
13 – INIT_PREDICTION_DOWN
14 – INIT_DEAD_ZONE_ADAPT_TIME
15 – INIT_RATED_TRAVEL
16 – INIT_ROTARY_ACT_END_FLAG
17 – INIT_INTERPULSE_PERIODE_LEN
2 – INIT_SAFTY_POSITION_FLAG
3 – INIT_PULS_LENGTH_UP
4 – INIT_PULS_LENGTH_DOWN
5 – INIT_ACT_TIME_UP
6 – INIT_ACT_TIME_DOWN
7 – INIT_SERVO_GAIN_DOWN
8 – INIT_SERVO_GAIN_UP
9 – INIT_REF_VALUE_HORIZ_LEVER
Size:28
Category:Vendor
Access:Engineer
Type:Structure
Help:The initialization data of a positioner can be read out and transmitted to another positioner. Therefore it is possible to exchange a defective device without interrupting the running process by an initialization.